Air distribution plan of the office with supply, recirculation and exhaust ducts, next to a Revit 3D model of the supply network
Final air distribution layout: supply diffusers and ducts (green), recirculation (blue) and exhaust (red), all served by the AHU in the plant room at the bottom left.
10,150 m³/hdesign supply airflow
61 %recirculated air (3,920 m³/h fresh air)
34ceiling diffusers, Ø202–302 mm
455 Panetwork pressure for the AHU fan
Vdesign = max(Vreq, Vload,H, Vload,C)ΔP = f (L/D) ρv²/2 + ξ ρv²/2

Problem

Design the complete mechanical ventilation and air-conditioning system of a single-storey office building in Copenhagen: 1,325 m², ten zones from a large open-plan workspace to four private offices, three bathrooms and a storage room, with peak loads of 54.6 kW in heating and 31.6 kW in cooling. A single central air handling unit (AHU) has to supply every room with enough fresh air for Category II indoor air quality and enough conditioned air to cover its loads, quietly and without drafts.

Approach

  1. Airflow per room: the largest of three requirements: fresh air to EN 16798-1 Category II (4 L/s per person plus 0.7 L/(s·m²)), the airflow to cover the heating load with supply air at 38 °C, and the airflow to cover the cooling load at 15.5 °C.
  2. Recirculation strategy: in a constant-volume system every room receives the same fresh-air share, so the room with the highest ratio (the open-plan workspace, 0.386) sets it for the whole building. The rest of the air is recirculated, which greatly reduces the heating coil load in the Danish winter. Bathrooms and storage are kept under negative pressure with dedicated exhaust.
  3. Vents: ceiling diffusers chosen on the manufacturer’s nomogram for throw, spacing, pressure drop and sound power, iterating the number of vents per room until all limits were met.
  4. Ducts: circular aluminium ducts in a tree layout along the corridor, sized with the velocity reduction method and standard diameters; secondary ducts and runouts were up-sized wherever rounding would have made the air speed up downstream.
  5. Pressure drop and fan: friction losses from the UNI 10381-2 charts and local losses from fitting coefficients, computed per segment with Excel solvers, to find the index run and size the AHU fan.

Supply diffuser layout Supply diffuser grid: 34 diffusers on seven branches (A–G), sized for throw, spacing and noise in each room.

Results

  • Airflows: 10,150 m³/h of supply air, of which 3,920 m³/h is fresh air and 6,230 m³/h (about 61 %) is recirculated. The exhaust from bathrooms, storage and offices extracts exactly the fresh-air intake, so the building stays in balance.
  • Diffusers: 34 supply diffusers (for example 12 × Ø302 mm in the open-plan workspace and 4 × Ø202 mm in the largest office), all at about 5 m/s blow-out velocity with 13–24 Pa pressure drop, plus 15 recirculation grilles.
  • Ducts: main trunk Ø630 mm tapering to Ø500 mm, with air slowing from about 9 m/s to 3 m/s; friction stays at or below 0.98 Pa/m everywhere, under the usual noise limit.
  • Fan: the critical path is the last diffuser of branch G (120.8 Pa). With 334.4 Pa in the main duct, the AHU fan must deliver 10,150 m³/h at about 455 Pa of external static pressure, plus its internal coil and filter losses.

Revit 3D model of the supply network Revit 3D model of the supply network, from the plant room along the corridor into the offices and workspaces.